JAC Contractors pours foundations, slabs, and post-tension systems that hold up under real-world loads, built to spec and finished on schedule.
From layout and forming to the final finish, one experienced crew handles your concrete scope, so there are no hand-offs and no excuses.
Engineered slab-on-grade and elevated PT decks for homes, parking structures, and commercial buildings, including tendon placement, stressing, and cut-off.
Slab, grade-beam, and pier foundations designed for your soil conditions and built to the engineer's plans.
Warehouse floors, tilt-up slabs, and parking lots finished to tight flatness and levelness specs.
Walls, columns, beams, and elevated decks, formed, reinforced, and poured with precision.
Driveways, sidewalks, curbs, and patios with clean edges, proper drainage, and lasting curb appeal.
Crack repair, PT tendon repair, and slab restoration to extend the life of your existing concrete.
Quality workmanship, reliable schedule performance, technical knowledge and specialized expertise in post-tension construction.
Post-tensioning uses high-strength steel tendons tensioned after the concrete cures. The result is a slab that actively resists cracking and movement, which matters on expansive soils.
Fewer columns and beams mean more open, usable space.
Compression keeps cracks tight and helps protect against soil movement.
Thinner sections and less rebar can shorten schedules and lower costs.
Typical relative performance. Results vary by design.
Illustrative comparison for general education. Your engineer of record determines the right system for your project.
We review your plans or visit the site and send a clear, detailed bid.
Layout, excavation, forming, and tendon or rebar placement, inspected and ready.
Controlled placement and expert finishing, followed by proper curing.
PT tendons stressed to spec, documented, and handed over on schedule.
A strong foundation for Ozona’s student-athletes—and a milestone for our company.
This marked our first project for a school district in West Texas. Our crew completed the concrete foundation and slab work for Ozona ISD’s new fieldhouse, covering approximately 30,000 sq. ft. We handled excavation, formwork, reinforcing steel installation, and concrete placement, including perimeter footings with vertical rebar for the building’s block walls.
Our work extended beyond the fieldhouse with approximately 30,000 sq. ft. of concrete parking beside the building and another 15,000 sq. ft. of concrete around the football field’s running track. Our scope also included the concession stand and retaining walls between the stand and the football field.
Our crew began work on January 5, 2026, completing approximately 40,000 sq. ft. of concrete foundation and slab work for the elementary school and library addition. Our scope included earthwork, excavation, formwork, reinforcing steel installation, and concrete placement.
Elevated Podium Post-Tension Installation
Our crew installed the post-tension cable systems for the elevated podium slabs at the Park West student housing community. Our scope also included PT installation for approximately 120,000 sq. ft. of slab-on-grade.
Our crew installed the post-tension cable system for approximately 126,100 sq. ft. of foundation slabs across four apartment buildings, a clubhouse, and garages.
Working with Bohannon Development Corporation, our crew handled excavation, formwork, post-tension installation, and concrete placement for the apartment foundations.
We also completed the full site concrete scope shown on the civil plans, including sidewalks, curbs, islands, accessible ramps, concrete paving, concrete work for trash enclosures, and valley gutters.
What began as an athletic facilities project in January 2024 grew into an ongoing relationship with Kermit ISD. Pleased with the results, the district entrusted us with the next phase: a new fieldhouse and concession stand.
After completing the fieldhouse and concession stand work, we moved on to concrete improvements at the football facility, including ADA ramps, parking lots, concrete curbs for new fencing, and work for a new ticket booth.
Concrete foundation and slab work on an approximately 6,000 sq. ft. agriculture and shop addition. Our crew handled excavation, formwork, reinforcing steel installation, column base plates, and concrete placement.
A look at JAC crews on the job: forming, setting steel, installing post-tension cable, and placing concrete.
Send us your drawings and get a detailed estimate fast.
Tell us about your project. We'll get back to you within one business day with next steps.
Don't see yours? Give us a call and talk to someone who's been on the job site.